




Description
Deciding faster costs accuracy, and deciding more accurately costs time. In the drift–diffusion model the trade is set by one number, the height of the bound. Size: a relation between two measures: time and errors. 3D model: custom builder "sat-curve".
Where the triangles are
Materials
- 3.2% coherenceMeshStandard · metal 0 · rough 0.4
- 6.4% coherenceMeshStandard · metal 0 · rough 0.4
- 12.8% coherenceMeshStandard · metal 0 · rough 0.4
- axes: time across (0.3 to 1.8 s), share correct up (50% to 100%)MeshStandard · metal 0 · rough 0.5
Motion
No animation is defined in this model's code: its builder returns a still model, with no clips, no update function and no time-driven material. In the app the part also appears in the lab station `brain/decision`, a live simulation; a station is a scene of its own, not part of this model, and is not captured here.
Specification
| Category | Science and biology / Biological processes |
|---|---|
| Kind | Processes |
| Collection | Processes |
| Repository | LAB |
| Version kept | Cell to Quantum, current source, 2026-11-11 |
| Confidence | high |
| Runtime | threejs |
| Bounding box | 60.1 × 30.2 × 7.12 scene units |
| Draw calls | 7 |
| Code | cell-journey/src/js/80-brain-20-decision.js + 3 files |
| Built and measured | 2026-11-24, 0.0 s build, three.js r160 |
Effects
More biological processes See all 80
Spike-timing-dependent plasticity (STDP)Processes
Spindle checkpointProcesses
Stall forceProcesses
Stokes–Einstein relationProcesses
The brain’s energy budgetProcesses
The rotation experimentProcesses
Theta rhythmProcesses
TonotopyProcesses
TranscriptionProcesses
Turing patternProcesses
V(D)J recombinationProcesses
Visual cycleProcesses