Watt flyball governor, studio

Description

Governing relation: h = g/ω²; r = √(L² − h²); ω = 2πn/60, L = 120 mm. Assembly: Install vertical spindle and separated bearings. Pin two equal upper arms, balls and lower links. Fit free sliding collar and measure sleeve force before control-system use. Limits: This is an unloaded geometric equilibrium. It does not predict regulation, hunting, friction, or safe operating speed.

Recorded status: Research concept; hardware qualification not established. Collection README records 19 nominal scenes blocked by route issues; sine-bar has no cable routes. This inventory did not rerun route approval.

Where the triangles are

  1. WGU08-001 Sixteen-strand protective braid37k · 3.2%
  2. WG-056 Bearing bridge mounting screw shank23k · 2%
  3. WG-059 Bearing bridge mounting screw shank23k · 2%
  4. WG-065 Bearing bridge mounting screw shank23k · 2%
  5. WG-068 Bearing bridge mounting screw shank23k · 2%
  6. WG-100 Displacement reference mounting screw shank23k · 2%
  7. WG-103 Displacement reference mounting screw shank23k · 2%
  8. WGD-135 Inductive speed pickup support mounting screw shank23k · 2%

Materials

  • steelMeshPhysical · metal 0.94 · rough 0.25
  • steelMeshPhysical · metal 0.94 · rough 0.25
  • steelMeshPhysical · metal 0.94 · rough 0.25
  • steelMeshPhysical · metal 0.94 · rough 0.25
  • steelMeshPhysical · metal 0.94 · rough 0.25
  • steelMeshPhysical · metal 0.94 · rough 0.25
  • steelMeshPhysical · metal 0.94 · rough 0.25
  • steelMeshPhysical · metal 0.94 · rough 0.25
  • steelMeshPhysical · metal 0.94 · rough 0.25
  • steelMeshPhysical · metal 0.94 · rough 0.25

And 1180 more.

Motion

One cycle of the study's saved operating simulation at the default control value: Steady governor orbit — coloured markers and guide lines travel over the assembly, driven by operation(model, x, progress) in operation-core.mjs for progress 0 to 1. The overlay is illustrative; the detailed parts are not rebuilt per frame. The study plays a cycle over 8 seconds; 24 frames sample it, so closely spaced markers can appear to flicker or step.

Specification

CategoryInstruments and research devices / Engineering test rigs
KindMechanical control
CollectionTwenty engineering classes
RepositoryMACHINES
Version keptCatalogued build, 2026-10-03
Confidencehigh
Runtimethreejs
Bounding box0.34 × 0.37 × 0.26 m
Draw calls1,190
Codesources/apexagi/studies/engineering-20-20260930/models/05-flyball-governor.mjs + 1 files
Built and measured2026-11-24, 0.9 s build, three.js r185

Effects

  • emissive 3
  • transparent 2
  • clearcoat 28

More engineering test rigs See all 13